There are 5 waste heat boilers in İsdemir Coke Plant to produce steam at the coke dry extinguishing facilities, by utilizing the waste heat generated during the extinguishing of hot coke, with a pressure of 39 kg / cm2g and 440 C temperature and 25 tons / h capacity. As these boilers complete their economic life, their serpentines are changed.

15XM, 13CrMo44,, Steel 20, 1.1151, C22E Serpentine bundles and other boiler pipes made of normalized special alloy forged steel materials are assembled according to projects and welded with the same precision.

Resources 100% RT,

Boiler tightness test,

Boiler Hydrostatic test,

Alkaline Washing Process,

Progressive Commissioning and Steam production,