LVFLR structure; It is the work of construction according to current construction and ISG regulations.

General features of the building,

It is a building with axle dimensions of 11.6m x 7.6m and a sitting area of ​​approximately 85m2.

Jet grout and mini pile applications will be made for ground improvement of the building. The contractor firm will design the jet grout that will achieve the 25t / m2 safe floor bearing capacity specified in the projects. For jet grout design, superstructure account report and ground survey report are given in the attachment of the tender file.

The structure bearing system consists of reinforced concrete raft foundation and steel superstructure.

All the dismantling and breaking works in the area where the building will be built, shown at the site, are also included.

In addition, Mersin Soda Sanayi A.Ş. Piping assemblies required for Soda Factory Age Section LVFLR Building Investment are carried out in line with the current construction, application, regulations and standards in line with the project, discovery and specifications in the attached files.

Band Filter Structure;

General features of the building,

It is a building with axle dimensions of 44.25m x 7.75m and seating area of ​​approximately 350m2.

The structural carrier system consists of a reinforced concrete foundation and a steel superstructure. On the 13 axis, it will be supported and raised by the existing steel columns. In 14 axes, reinforced concrete raft foundation will be formed and it will support the steel superstructure system.

For the construction of the building, the removal of the existing band filter facades, steels and all necessary crushing works are within the scope.

The roofs of existing tape filter buildings will be upgraded as given in the tender dossier projects.

As given in the tender dossier projects, it is within the scope of the carrier system manufacturing of A1, 3A1, 4A1 and 5A1 nash pumps.

SCOPE OF ARCHITECTURAL WORKS

Soda Sanayii A.Ş. It is the work to be carried out in line with the current construction, application regulations and standards in line with the projects, unit price descriptions and summary summary of the projects given in the tender dossier.

SCOPE OF MECHANICAL INSTALLATION WORKS

Mersin Soda Sanayi A.Ş. The scope of the work is to make the piping assemblies required for the Investment of Soda Factory Wet Section Band Filter Structures in line with the current construction, application, regulations and standards in line with the project, discovery and specifications in the attached files.